Skip to content
CUSIMANO · CONSTRUCTION
Construction manager reviewing project schedule and budget with owner
Design-Build & Construction Management

Construction Management Services — Fee-for-Service, Owner-Aligned

Fee-for-service construction management for owners who want a CM-at-risk or CM-as-agent delivery model. CBC-licensed GC with a documented construction management capability set.

When the owner wants transparency

Construction management aligns the CM with the owner, not against them

A traditional GC contract is adversarial by design: the GC profits when costs come in under bid and the owner profits when scope expands without change orders. Construction management restructures the relationship — the CM is paid a fee for services, and the trade contracts sit between the owner and the subs directly (or are held by the CM at-risk under a GMP). The CM’s incentive aligns with delivering the project on budget and schedule, not with hiding cost in the bid. CCL’s bio explicitly lists Construction Management as a delivery method offered (fee-for-service) and documents the capability set: Team Integration, Project Scheduling, Cost Control, Value Management, Bid Management, Site/Subcontractor Supervision, Quality Control, Safety, Data systems, Project Close-Out, Warranty Management. Construction management is part of the operating model, not a marketing claim.

Construction management scope

  • Pre-construction services: budgeting, scheduling, value engineering, constructability review
  • Bid management: trade contractor solicitation, bid evaluation, contract award
  • Site/subcontractor supervision throughout construction
  • Cost control: monthly reporting, change-order management, GMP reconciliation
  • Quality control: site inspections, QC checklists, deficiency tracking
  • Safety oversight: jobsite safety program coordination
  • Schedule management: master schedule updates, critical-path tracking
  • Data systems: project documentation, RFI/submittal management
  • Project close-out: punch resolution, COC, warranty handoff, lien releases

How our construction management engagements run

  1. 01

    Pre-construction

    Budgeting, scheduling, value engineering, constructability review during design.

  2. 02

    Bid and award

    Trade-by-trade bid solicitation, evaluation with owner, contract award.

  3. 03

    Construction oversight

    Site supervision, schedule management, cost reporting, quality control through completion.

  4. 04

    Close-out

    Punch, COC, warranty handoff, final cost reconciliation, lien releases — clean handoff to ops.

Why owners pick us for CM services

Construction management is a documented delivery model

Bio explicitly lists Construction Management (fee-for-service) as a delivery method. Capability set: Team Integration, Project Scheduling, Cost Control, Value Management, Constructability Document Review, Bid Management, Site/Subcontractor Supervision, Quality Control, Safety, Data systems, Project Close-Out, Warranty Management.

42 years of project-management experience

Stephen Cusimano’s skill set explicitly includes strategic planning, project management, project assessment, conceptual estimating, project scheduling, value engineering, design review, risk management, and claims management & resolution.

CBC 1258403 — multi-vertical experience

CBC license, hospitality + commercial + residential project portfolio. CM engagements span project types.

Construction management — common questions

  • What’s the difference between CM-at-risk and CM-as-agent?

    CM-at-risk: we hold the trade contracts and stand behind a GMP — closer to a GC role with CM transparency. CM-as-agent: trade contracts sit between the owner and the subs directly; we provide management services for a fee. Both models work; choice depends on owner risk tolerance and lender requirements.

  • How are CM fees structured?

    Either as a percentage of construction cost or as a fixed fee. For larger projects, fixed-fee with defined pre-construction and construction phases is the most common structure. We’ll propose what fits the project scale.

  • Do you self-perform any work under CM?

    Generally no — CM is meant to keep the manager neutral against the trades. We can self-perform a defined scope (typically general conditions or general requirements) but the bulk of trade work is bid out under owner-approved contracts.

  • What kinds of projects benefit most from CM?

    Complex projects with evolving scope, projects where the owner wants visibility into trade pricing, projects with phased delivery, and projects where the owner has internal capacity to participate in trade selection. Simple, well-defined projects often do fine with a traditional GC contract.

  • Can you transition into a CM role mid-project?

    Yes, though it’s uncommon. Mid-project transitions are usually triggered by issues with the original GC; we walk into a project mid-stream, audit current state, and provide CM oversight from that point. Engagement scope is project-specific.

FAQ

Considering CM-at-risk or CM-as-agent? Let’s talk fit.

Walk-through, model recommendation, fee structure proposal.