Restaurant Construction — Built to Open on Your Launch Date
Full restaurant construction and tenant fit-outs: hood systems, grease interceptors, refrigeration, FOH finishes. CBC-licensed GC with QSR, fast-casual, and full-service experience.
Every week past opening day is rent on a building you can’t serve from
Restaurant construction has more moving regulatory pieces than most build-outs — Department of Health, fire marshal, grease interceptor sizing, hood and make-up air, kitchen equipment specifications, ADA, and brand standards if it’s a franchise. Miss any of them and inspection day becomes inspection-week-and-a-half. We’ve built restaurants ranging from Dunkin’ Donuts build-to-suits in Key West to in-hotel restaurants inside the Travelodge-to-Holiday-Inn conversion in Kissimmee. Sandra Jarrett of LPI Holding noted in writing that we built their third Dunkin’/Baskin facility in 120 days. Restaurants get built fast when somebody’s done it before.
Restaurant construction scope
- Pre-construction permit-pulling: Department of Health, fire marshal, building
- BOH kitchen rough-in: hood, make-up air, grease interceptor, equipment connections
- Refrigeration coordination: walk-in coolers, freezers, line refrigeration
- FOH finishes: flooring, millwork, bar build, banquette installation
- Equipment installation coordination with kitchen equipment vendor
- ADA compliance: restroom layout, path of travel, counter heights
- Franchise brand-standard finish execution (POS, signage, decor packages)
- Pre-opening inspections: building, fire, health, ABT license setup
- Punch and turnover documentation for ops team
How we run a restaurant build
- 01
Pre-construction review
Plans, equipment list, brand book if franchise — reconcile everything before permit submission.
- 02
Permit + utility coordination
Building permit, health permit, fire marshal, utility upgrades if needed — handled before mobilization.
- 03
Shell to rough
Demo (if existing), structural mods, MEP rough-in to equipment spec, hood install.
- 04
Equipment and finishes
Kitchen equipment install with vendor, FOH finishes, bar, signage, ADA-compliant restrooms.
- 05
Pre-opening
Inspections, COC, equipment commissioning, training walkthrough with ops team.
Why restaurant owners hire us
Documented QSR and full-service work
Reference: 120-day Dunkin’ build
CBC 1258403 — Florida CBC since 2002
Restaurant construction — common questions
How long does a typical restaurant build take?
A 2,500-4,000 sq ft restaurant runs 90-150 days from permit to opening, depending on whether the shell exists, utility upgrades needed, and equipment lead times. Franchise builds with documented brand packages tend to be faster than custom.
Do you handle the kitchen equipment?
We coordinate equipment install with your kitchen equipment vendor. Buying equipment direct from the manufacturer or through a kitchen designer is usually cheaper than passing it through the GC.
What about hood, make-up air, and grease interceptor sizing?
Sized by your equipment vendor or MEP engineer, installed by us. Both have specific code requirements that the fire marshal and Department of Health each enforce. We coordinate inspections.
Do you do franchise build-outs?
Yes — Dunkin’, Baskin-Robbins, and other quick-service brands in our portfolio. Franchise build-outs go faster when the brand has a current spec book and the GC has done it before.
What inspections do restaurants need before opening?
Building (COC), fire marshal, Department of Health, and ABT licensing if you’re serving alcohol. We coordinate building and fire inspections; DOH and ABT typically run after substantial completion.
Related Services
Opening a restaurant? Let’s talk schedule.
On-site walk-through and a permit-realistic timeline within a week.